Product name: Panic exit device for fire door
Item no:DT-1400RA-P
Description
Exit device in surface and rim design
The full length push rail
Rail assemblies and end are steel or stainless steel
Dogging fuction available
All spring shall be of stainless steel throughout
conforms and meets ADA regulation
Lever and escutcheon trims are grade 1 construction with clutch on rose trim
Non handed door
A lateral lock point
End cap: Steel
Outside handle
Product dimension:
Outside handle option
DT-H101
DT-H102
Headquartered in Hefei, China, Dortec was established in July, 1995. Thanks to the reforming and opening-up policy of Chinese Government, Dortec has been developing to a large modernized enterprise group with 500 employees and a turnover of US$10 million in 2003. Dortec has 5 holding companies and about 100 categories: Panic exit device, Swing door operator, Slide door operator, Floor Spring, Glass door clamp, Door Closer, Brass Hinge, Stainless steel hinge etc.
Dortec always takes quality for its life. Since the establishment of the company, Dortec always keeps this motto in theirhearts: We would rather spend millions of dollars more to prevent even one piece of unqualified products go out of our workshop. Dortec sincerely promises to guarantee the quality and to continually provide reliable and excellent products to our customers all over the world.
In the year 2001, Dortec have got ISO9001-2000 certification. Still to now, many of our products are certified under, CCC, the Fire-testing.
Accepted Delivery Terms |
FOB/CIF |
Accepted Payment Currency |
USD,RMB |
Accepted Payment Type |
T/T,L/C |
Nearest Port |
Shanghai Port |
Delivery Time |
After received T/T 30% advance payment |
Packing Detail |
Carton box |
FAQ:
Q1:What's the minimum order quantity ?
A1: 100pcs for each item for door handle , total order amount no less than 5000USD.
Q2:How can we get to know the quality before placing an order?
A2:Samples can be provided for quality testing
Q3:How can we get samples from you?
A3:Free samples can be provided,you just need to pay the freight
Q4:How long is the delivery time?
A5:30-45 days after received the deposit.If you have special requirement on delivery time,please let us know.
Q6:What's the payment terms?
A6:T/T 30%deposit and balance before shipment
Q7:What's the price terms?
A7: FOB SHANGHAI, EXW, CFR avaible
Q8: What's the guarantee
A8: All DORTEC product provide 5 years guarantee
Q9:Can the product and packing be made with our logo or brand?
Yes, it is problem to make the product with customers logo and brand based on qty over 1000pcs / item